Network+ Lab Simulator (LabSim) Update

Pin It

LabsimCertExams.com recently updated Lab Simulator for Network+ exam. The labsim has been updated to .NET version from the current VB6 version. The update is expected remove a few known bugs, like incompatibility with Adobe 11 software.

Various important features of the software are given below:

Several ready made lab exercises -currently 100+ labs are included with scenario type labs for NAT, Gateware configuration, etc
Workstation, Server, Access Point, Router and Switch (IOS) network simulator.
Configure Wireless Access Point, DHCP Server, and Switches.
Detailed help files that provide step by step instructions on using the simulator have been provided.
The demo version is limited to a fewer labs, and upto global configuration mode is supported in demo version.
Network designer provides drag and drop feature for inserting devices and connectors. GUI based device configuration.
Detailed Lab Manual provided.

Download free demo exam from the product web page:

http://www.certexams.com/routersimulator/network-lab-simulator.html

ISRO’s Mars Orbiter Mission – A Big Success

Pin It

mars_img Mars Orbiter Mission (MOM), an inter planetary mission to planet Mars, has become a huge success with the satellite entering the designated MARS orbit, a few days back. Indian Prime Minister Mr. Narendra Modi himself witnessed the final orbital maneuvers and congratulated the ISRO and other scientists and engineers who contributed to the successful launch.

Indeed, the MOM experiment is a giant step forward for India. It is notable that India achieved the success on its first attempt itself whereas more advanced countries like, USA took several attempts before realizing the dream. It is widely acknowledged that the mission is very complex in nature, and it took about an year to achieve the feat.

The brief time table for the mission is given below:

It has been configured to carry out observation of physical features of mars and carry out limited study of Martian atmosphere with following five payloads:

  • Mars Colour Camera (MCC)
  • Thermal Infrared Imaging Spectrometer (TIS)
  • Methane Sensor for Mars (MSM)
  • Mars Exospheric Neutral Composition Analyser (MENCA)
  • Lyman Alpha Photometer (LAP)

Various dimensions of the rocket used for the mission are as given below:

Lift-off Mass 1337 kg
Structures Aluminum and Composite Fiber Reinforced Plastic (CFRP) sandwich construction-modified I-1 K Bus
Mechanism Solar Panel Drive Mechanism (SPDM), Reflector & Solar panel deployment
Propulsion Bi propellant system (MMH + N2O4) with additional safety and redundancy features for MOI. Proplellant mass:852 kg
Thermal System Passive thermal control system
Power System Single Solar Array-1.8m X 1.4 m – 3 panels – 840 W Generation (in Martian orbit), Battery:36AH Li-ion
Attitude and Orbit Control System AOCE (Attitude and Orbit Control Electronics): with MAR31750 Processor

Sensors: Star sensor (2Nos), Solar Panel Sun Sensor (1No), Coarse Analogue Sun Sensor

Actuators: Reaction Wheels (4Nos), Thrusters (8Nos), 440N Liquid Engine

Antennae: Low Gain Antenna (LGA), Mid Gain Antenna (MGA) and High Gain Antenna (HGA)
Launch Date Nov 05, 2013
Launch Site SDSC SHAR Centre, Sriharikota, India
Launch Vehicle PSLV – C25

aamangalyan
image courtesy:
http://swapsushias.blogspot.in/2013/11/things-you-must-know-about-isro-mars.html#.VCgpsFJoFxA

Timeline:

Phase Date Event Detail Result
Geocentric phase 5 November 2013 09:08 UTC Launch Burn time: 15:35 min in 5 stages Apogee: 23,550 km
6 November 2013 19:47 UTC Orbit raising manoeuvre Burn time: 416 sec Apogee: 23,550 km to 28,825 km
7 November 2013 20:48 UTC Orbit raising manoeuvre Burn time: 570.6 sec Apogee: 28,825 km to 40,186 km
8 November 2013 20:40 UTC Orbit raising manoeuvre Burn time: 707 sec Apogee: 40,186 km to 71,636 km
10 November 2013 20:36 UTC Orbit raising manoeuvre Incomplete burn Apogee: 71,636 km to 78,276 km
11 November 2013 23:33 UTC Orbit raising manoeuvre
(supplementary)
Burn time: 303.8 sec Apogee: 78,276 km to 118,642 km
15 November 2013 19:57 UTC Orbit raising manoeuvre Burn time: 243.5 sec Apogee: 118,642 km to 192,874 km
30 November 2013, 19:19 UTC Trans-Mars injection Burn time: 1328.89 sec Successful heliocentric insertion
Heliocentric phase December 2013 – September 2014 En route to Mars – The probe travelled a distance of 780,000,000 kilometres (480,000,000 mi) in a parabolic trajectory around the Sun to reach Mars This phase plan included up to four trajectory corrections if needed.
11 December 2013 01:00 UTC 1st Trajectory correction Burn time: 40.5 sec Success
9 April 2014 2nd Trajectory correction (planned) Not required Rescheduled for 11 June 2014
11 June 2014 11:00 UTC 2nd Trajectory correction Burn time: 16 sec Success
August 2014 3rd Trajectory correction (planned) Not require
22 September 2014 3rd Trajectory correction Burn time: 4 sec Success
Areocentric phase 24 September 2014 Mars orbit insertion Burn time: 1388.67 sec Success

Top Ranked Universities in the World – A Critical Review

Pin It

Now that the top ranked universities list has been published by QS, not surprisingly, the list doesn’t include any Indian universities, a country where the world’s first known university was established (See http://en.wikipedia.org/wiki/Nalanda) . The criteria for selecting world’s top universities is as given below:

  1. Academic Excellence – Based on global survey of academics; Weightage: 40%
  2. Employer Reputation – Based on global survey of graduate employers;.   10%
  3. Faculty/Student Ratio – 20%
  4. Citations per Faculty – An indication of research impact 20%
  5. International Student Ratio – Measures international diversity of students, 5%
  6. International Staff Ratio – Measures international diversity of faculty, 5%

None of the Indian universities are in the top 200, which surprises many people who are aware that IIT’s (Short for Indian Institute of Technology) are among world’s best institutes. The IIT entrance exam is conducted in 2 stages. 1. JEE MAIN, 2. JEE Advanced (JEE stands for Joint Entrance Exam). For 2013, the number of candidates appeared for JEE MAIN stands at around 1.5 million as against an intake of about 10,000 by all IITs in India. Successful candidates, may appear for IIT Advanced. The number of students who appeared for IIT Advanced in the year 2012 stands at 506,000. That is one student is selected out of 50, just to get entry in an IIT, irrespective of the branch of study. Apart for IITs, there are other primier institutes like NIT (National Institutes of Technology) and BITS (Birla Institute of Technology), and others.

The very fact that none of these institutes appear in top 200, one wonders if there is any improvements that need to be done.  It may be necessary to include the following in selecting the best universities:

1. Competition that a student has to face to get selected (total number of students applied to the number of seats available)

2. Competition that a faculty member has to undergo for getting selected (number of applications received for a faculty position).

3.  The international staff ratio may be waived for universities in India because being a populous country, lot of talent exists withing the country.

4. Number of entrepreneurs created over the past 10 years or so on a rolling average basis.

On the other hand just see the stats released by PitchBook Data, a US-based private equity and venture capital research firm.  Indian Institutes of Technology (IITs) are ranked fourth on a list of 50 best entrepreneurial undergraduate institutes in the worl

http://www.financialexpress.com/news/iits-among-worlds-5-best-entrepreneurial-undergraduate-institutes-smriti-irani/1290813

Indian look forward to a more inclusive stats during the years to come.

Source: http://www.theguardian.com/higher-education-network/ng-interactive/2014/sep/16/-sp-qs-world-university-rankings-2014

 

 

Dot Net Conversion of CCNA NetSim Complete

Pin It
CertExams.com NetSim
CertExams.com

 The conversion of Network Simulator from VB6 to .NET has been completed successfully. It may be recalled that several of new softwares such as Adobe stopped supporting VB6 applications in their latest versions (Adobe 11) and necessitated .NET conversion of VB6 projects. The software is in beta testing and may be downloaded from certexams.com

Product page: http://routersimulator.certexams.com/network-simulator-designer.html

Download page:: http://routersimulator.certexams.com/ccna-simulator-download/download-network-simulator-designer.html

CertExams.com CCNA™ Network Simulator cum Designer is a CCNA™ router and network simulator offers best price-performance ratio. You can design, build and configure your own network. The software supports 200+ router/switch commands with over 100 labs, enabling the candidate to build, test and preview a large variety of networks! CCNA™ Simulator w/Designer is suitable for:

  1. Anyone studying for the Cisco® CCNA™ 640-802 exam
  2. Deployment of routers andswitches in a LAN/WAN network environment
  3. Corporate trainers and employees
  4. Students at colleges, universities, and technical institutes

 

Vijayawada – The New Capical of Andhra Pradesh!

Pin It
Nara C Babu
Nara Chandra Babu Naidu

AP cabinet, headed by the Chief Minister of Andhra Pradesh, has finally resolved to announce the capital of Andhra Pradesh. It is going to be developed around Vijayawada on the banks of river Krishna.

It may be recalled that the state had been divided by creating a new state of Telangana,  and the state of Andhra Pradesh remained without capital for over 6 months. The existing capital of AP (Hyderabad) had been announced as the capital of Telangana.

Vijayawada, along with Guntur, Tenali, and Mangalagiri (called VGTM) is going to form the new capital of Andhra Pradesh. The whole region is likely to be part of greater Vijayawada.

The state is still looking at the center for implementing the promises that it had agreed to while dividing the state. Most notable among these are:

1. Financial help in the development of new state capital

2. Declaration of residual state of AP with Special Ss, which means that the companies enjoy tax holiday for a pre-determined period of time (about 5 to 10 years).

3. Special package to backward districts in AP

4. Completion of Polavaram Dam

however, no significant funds have been allocated for so far for development of state by the Modi government so far.  Also, the special status is still pending. It remains to be seen whether the AP govt will succeed in getting required resources and assistance for the central government to fulfill its promises to the people of AP.

Good luck!

Indian Prime Minister Narendra Modi Completes 100 days in Office

Pin It
Narendra Modi
NaMo

Indian Prime Minister Narendra Modi completed 100 days in office. Here are a few observations:

1. Set the ball rolling on un-earthing black money stashed in swiss banks by constituting a committee.

2. Visited Bhutan for improving bilateral trade and cultural relations.

3. Presented first budget,in which he contemplated smart cities, and bullet trains.

4. Visited Japan for investments in India and exchange of cultural activities. Japan promised to invest up to 35 billion USD in India during next 5 years.

5. Expedited road and rail constructions in border areas to improve movement of army personnel, and civilians in border areas.

6. Chinese premier will be visiting next week with a proposal to set up technology parks in Ahmadabad and Pune, with investment up to 7 billions.

7. The GDP of the country seen a small improvement during the first 3 months of this FY 2014-15, which may be primarily distributable to Modi sentiment.

There are great expectations from Modi government, and it is generally believed that the economic, social, and defense areas are going to be strengthened over the next few years.

Good luck!

Free JEE MAIN (AIEEE) Mock Tests from PrepExams.in

Pin It

PrepExams.in, an innovative prep exams provider for entrance tests, is offering JEE Main Mock Tests free of cost! Students may download the tests by registering themselves on prepexams.in. The prepexams are entirely free in its beta version, and consists of thousands of questions with solutions.

The notable feature of these prep tests is that the question bank consists of old question papers and model questions with solutions. The mock tests mimic the actual online exam, thus enabling the students to take the JEE MAIN exam with confidence. Why pay when you can get it FREE?

Checkout the mock tests page here:

http://www.prepexams.in/JEE-Main/jee-main-product-downlod.html

All about JEE MAIN Exam:

http://www.prepexams.in/JEE-Main/jee-main-exam-details.html

Detailed stats are provided, including the time taken for correct, incorrect, and un-answered question; relative ranking, weak/strong areas, exam customization, etc.

The download and activation of the mock tests is automatic, and FREE!

 

CompTIA Security+ Exam Cram Notes

Pin It

SimulationExams.com released cram notes for CompTIA Security+ Exam SY0-301. The exam syllabus includes Network Security, Compliance and Operational Security, Threats and Vulnerabilities, Application, Data and Host Security, Access Control and Identity Management, and Cryptography.

The notes is prepared to help the candidates to serve as a last minute preparation tool. Feedback may be emailed to cs at simulationexams.com

The cram notes is suitable for candidates preparing for CompTIA Security+ Cert exam CompTIA Security+ Exam Cram

Available products –

Exam Simulators: CompTIA A+ Essentials Practice Tests, CompTIA A+ Practical Practice Tests, Cisco CCENT Exam Sim, ICND2, CCNP Route CCNP Switch, and others.

About Security+ Certification: Security+ is a certification sponsored by CompTIA, the Computing Technology Industry Association. Security+ is offered by Comptia Systems on successful completion of SY0-301 exam. The Security+ Certification shows that you have the competence required to implement security tools, and procedures to react to security threats as well as anticipating security risks and guarding against any incidents before they occur. It is an entry level cert and among the most widely recognized certifications in the world. The course is considered to be one of the leading vendor-neutral certification for security professionals.

Disclaimer: Simulationexams.com is not associated or affiliated with CompTIA or any other company. SimulationExams.com is a group website of Anand Software and Training.

CertExams.com Releases CCENT 100-101 Exam Cram Notes

Pin It

CertExams.com released cram notes for Cisco CCENT 100-101. The cheat sheets consist of about 30 pages covering the following topics:

OSI (short for Open Systems Interface) and TCP/IP Cisco IOS Fundamentals, IPv4 Addressing, Subnetting and Variable Length Subnet Masks (VLSM), Routing Protocols IGRP, EIGRP, RIP 2, ng;, OSPF, and others, Routed Protocols: IP, IPX, etc., Frame Relay, Access-Lists: Standard, Extended, and Named Different Types of Network Address Translaions (NAT), Router/Switch Configuration Commands, IPv6 Addressing, Switching: VLANs and VTP, Switching: Spanning Tree Protocol (STP), Router/Switch Troubleshooting Commands, and others.

The notes, suitable for candidates preparing for CCENT (Short for Cisco Certified Entry Network Technician), and ICND2 (Interconntecting Cisco Network Devices)., is prepared  to serve as a last minute preparation tool for candidates preparing for the exam. Feedback may be emailed to cs at certexams.com

Checkout Cisco CCENT/ CCNA Cheat Sheets home page

Available products –

Network Simulators: CCNA NetSim, CCENT NetSim, Juniper NetSim, and others

Exam Simulators: CCNA Exam Sim, Cisco CCENT Exam Sim, ICND2, CCNP Route CCNP Switch, and others.

About CCENT Certification: CCENT is offered by Cisco Systems on successful completion of Cisco Certified Entry Network Technician exam. The exam covers configuring and troubleshooting small networks using Cisco switches and routers, running Cisco IOS. CCENT is an entry level certification followed by much popular CCNA certification.

Disclaimer: CertExams.com is not associated or affiliated with Cisco or any other company. CertExams.com is a group website of Anand Software and Training.

India Successfully Fires GeoSynchronous Satellite Launch Vehicle with Indigenous Cryo Engine.

Pin It

GSLV-1

The figure shows the GSLV D5 launch just a few seconds after ignition. GSLV is a three stage vehicle, 49 m tall with 414 t lift off weight. It is capable of placing satellites weighing 2-2.5 tons into geosynchronous transfer orbit (GTO)

On January 5, 2014, India successfully launched it’s rocket to put a 2000+ KG satellite in geosynchronous orbit. So, what is so special about it? To answer this question, we need to go back in time. The entire space program had started in early 80′ where the actual planning took place. India contemplated to achieve mastery over space technology in four stages over a period of 15 years. The various steps involved are:

  1. SLV (Simple firing of a Satellite Launch Vehicle)
  2. ASLV (Short for Augmented Satellite launch Vehicle)
  3. PSLV (Short for Polar Satellite launch Vehicle) – objective is to put sun synchronous satellites in orbit
  4. finally, GSLV (Short for GeoSynchronous Satellite Launch Vehicle) – to put communication satellites in a Earch Stationary Orbit.

We had developed and achieved self sufficiency in the first 3 categories of satellites fairly quickly, and almost as per the planned schedules. India had sought the help of USSR (then) in mastering the GSLV technology, as it requires putting a satellite in an orbit that is 36,000 KM above earth, and requires a technology, known as Cryogenic Engine Technology and uses liquid Orxygen and liquid Hydrogen at temperatures far below normal temperatures. Russia (Formerly USSR) agreed to initially supply a few engines and then deliver the technology (technology transfer) in stages. However, after supplying 2 or 3 engines, Russia gone back on their promise under extreme pressure from other developed nations. Under these circumstances, coupled with sanctions from USA and other countries against supply of any space related components or technology to India, India was left all alone with very few friends to rely on.

The success is not without failures. Several missions with indigenous and imported engines had failed, with many people doubting whether India could achieve this mile stone at all! Originally, India’s self reliance in launching GSLV rocket was supposed to be achieved by 1995. However, given the circumstances, the indigenous development had been delayed significantly due to failures in perfecting the Cryo engine technology.

Hearty congratulations to Dr. K. Radhakrishnan and his team for successful launch of GSLV D5. India is looking forward to many more such achievements from our distinguished scientists and technocrats!

Visit official website here: http://www.isro.org